Home › Guides › Kitchen renovation: the order of work
Kitchen renovation: the order of work
Quick answer: Plan and order first, strip out second, then first fix (plumbing, gas, electrics), plaster, fit units, then worktops, then second fix and finishing. Getting the order wrong is the most common cause of delays and extra cost.
Some links here are affiliate links: we may earn a small fee if you buy, at no extra cost to you.
1. Plan, measure and order
Measure carefully, including windows, doors, pipes and sockets, and settle the layout before you buy. Order units and worktops early, and ask for written delivery dates. Check each delivery for damage before the old kitchen is removed.
2. Strip out
Disconnect and remove the old units, appliances and, if needed, flooring. Set up a temporary kitchen with a kettle, microwave and fridge in another room.
3. First fix
Plumbing, gas and electrical first fix goes in before the walls are finished. Gas work must be done by a Gas Safe registered engineer. See kitchen regulations.
4. Plaster and make good
Repair walls and ceilings and allow them to dry before painting or tiling. Rushing this is a common cause of cracks and peeling paint.
5. Units, worktops and sink
Fit wall units and base units, checking levels, then the worktops and sink. Templates or exact measurements for stone and some solid worktops are taken after the base units are in.
6. Second fix and finishing
Connect appliances, fit sockets, lighting and taps, then flooring, splashback, painting and trims. Snag the job and hold back the final payment until everything is right.
Use our free kitchen renovation checklist to tick off each step.
Some links here are affiliate links: we may earn a small fee if you buy, at no extra cost to you.
Frequently asked questions
How long does a kitchen renovation take?
A straightforward like-for-like refit often takes one to two weeks once units are on site, but moving services, plastering or flooring adds time. Ask your fitter for a written schedule.
Should flooring go in before or after the units?
It depends. Many fitters put base units on the subfloor and lay flooring around them, others lay it first. Ask your fitter and agree who is responsible for it.
Can I live at home during a refit?
Yes, with a temporary kitchen set up elsewhere. Expect dust, noise and no water for short periods.
Keep reading
- How to plan a kitchen layout
- Kitchen regulations: gas, electrics and building control
- How to compare kitchen fitter quotes
- How to set a kitchen budget
- Small kitchen ideas that work
Checked 12 November 2026. Prices, products and regulations change, so check the official or supplier page before you rely on anything here.